*For enquiry of the status of new application cases, you may contact the corresponding officers in the ‘Contact List for New Application Case Status Enquiry’.
Pursuant to Section 14 of Waterworks Ordinance (Cap. 102) (WWO), a person must not construct, install, alter, or remove a fire service or inside service unless the Water Authority has granted a written permission for it. The Water Authority may grant the written permission on his own initiative or on application of a licensed plumber. Besides, Section 15 of the WWO also stipulates that, a person who is not a designated person# must not carry out the construction, installation, maintenance, alteration, repair or removal of a fire service or inside service (i.e. specified plumbing works).
The Water Authority may waive the requirement of permission under Section 14 of the WWO in the case of alterations to a fire service or inside service which are, in his opinion, of a minor nature, see Works of a Minor Nature for details.
Alterations to a fire service or inside service must not be considered as of a minor nature if the alterations would, in the opinion of the Water Authority, adversely affect the efficiency of the fire service or inside service in providing a reliable and adequate supply of water; or the quality of the water.
# “Designated person” means:
- a licensed plumber;
- a registered plumbing worker;
- a registered plumbing worker (provisional);
- a person who carries out specified plumbing works under the instruction and supervision of a licensed plumber or registered plumbing worker; or
- a public officer authorized by the WA.
- Water Supply for New Buildings
- Water Supply for New Buildings adopting Modular Integrated Construction (MiC)
- Water Supply for Projects Designed with Building Information Modelling (Electronic Submission)
- Water Supply for New Village Type Houses (Electronic Submission)
- Water Supply for Simple Cases for Selected Business Trades or Separate Metering (Electronic Submission)
- Installation of Separate Water Meter
- Refixing of Water Meter
- Portable Meters
- Water Supply for 2 - storey warehouse through One Stop Centre
- Enhancement Measures for Processing Applications for Water Supplies
- Template for Preparation of Application of Water Supplies in Proposal Stage
- Scheme for Installation of Separate Water Meter for Subdivided Units in Residential Premises – Self-Certification Scheme by Licensed Plumbers
- Overview of Information on Submission of Application for Water Supply