Latest Version
- Technical Requirements for Plumbing Works in Buildings (Jan 2025)
- Figures (Jan 2025)
- Amendment Table for Jan 2025 Version
- Enhanced Technical Requirements for GA 2.0
Previous Version
(Dec 2021)
- Technical Requirements for Plumbing Works in Buildings (Dec 2021)
- Figures (Dec 2021)
- Amendment Table for Dec 2021 Version
(Nov 2020)
- Technical Requirements for Plumbing Works in Buildings (Nov 2020)
- Figures (Nov 2020)
- Amendment Table for Nov 2020 Version
(Oct 2019)
- Technical Requirements for Plumbing Works in Buildings (Oct 2019)
- Figures (Oct 2019)
- Amendment Table for Oct 2019 Version
(Aug 2018)
- Technical Requirements for Plumbing Works in Buildings (Aug 2018)
- Figures (Aug 2018)
- Table showing the references of the requirements
Note: Unless otherwise specified, the Technical Requirements for Plumbing Works in Buildings will be effective for all new applications (Form WWO 542) submitted on or after 1 October 2018. Please refer to WSD Circular Letter No. 4/2018 for details.