(A) Wired Smart Water Metering
- Introduction of the AMR System in Water Supplies Department
- Letter to Designers of AMR Outstation – Revised Standard Requirements and Specification (14 November 2022)
- Letter to Designers of AMI Outstation – Revised Standard Requirements and Specification (14 March 2025)
- Standard Requirements for Supply and Installation of AMR Outstation (Version 11/2022)
- Standard Requirements for Supply and Installation of AMI Outstation (Version 3/2025)
- Standard Specification for AMR Outstation (E-89-01) (November 2022)
- Standard Specification for AMI Outstation (E-89-01) (March 2025)
- Drawings for the Supply and Installation of AMR Outstation (November 2022)
- Drawings for the Supply and Installation of AMI Outstation (March 2025) (CAD DWG files: Part 1, Part 2 and Part 3)
(B) Wireless Smart Water Metering
- Letter to Designers of AMI Outstation - Announcement of Adoption of Wireless AMI (11 July 2025)
- Standard Specification for Wireless Advanced Metering Infrastructure (AMI) Systems (E-89-02) (October 2025)
Fillable Form:
Appendix B Appendix C Appendix D
Information Pack for Wireless AMI Systems
- Sample Submissions
- Typical Drawing(s)
- Reference Rate of the Wireless Meter Interfacing Devices (WMIDs)
- Frequently Asked Questions (FAQs)
- Blank Design Change Request Form (Fillable Form)
For general enquires of the Wireless AMI Systems, please contact us at 3578 6458.
(N.B. Formerly named as Automatic Meter Reading (AMR) system)