Project Scope

  1. Construction of a fresh water pumping station at Sau Mau Ping Road with a pumping capacity of 22,000 m3/day;
  2. Construction of a fresh water service reservoir at Anderson Road with a capacity of 12,000 m3;
  3. Construction of a salt water service reservoir at Anderson Road with a capacity of 2,800 m3;
  4. Laying of approximately 2 km of fresh and salt water mains with sizes ranging from 300 mm to 900 mm in diameter;
  5. Installation of additional salt water pumps with a pumping capacity of 5,200 m3/day in the existing Shum Wan Shan salt water pumping station; and
  6. Installation of additional fresh water pumps with a pumping capacity of 22,000 m3/day in the existing Shum Wan Shan fresh water pumping station.

Approved Project Estimate

$231.5M

Commencement Date

28 November 2011

Completion Date

28 February 2015

Current Progress

Substantial Completion

Project Office in WSD

Design Division

Consultant

AECOM Asia Co. Ltd.

Contract