The scope of the project comprises laying of about 1.4 kilometres of fresh water submarine mains with diameter of 500 millimetres between Lantau and Cheung Chau and the associated land mains at the two landfalls.
HK$254.8M
24 October 2013
January 2017
100% completed.
Construction Division
Black & Veatch Hong Kong Limited
Contractor: China Road - China Pipeline Joint Venture