Performance Targets and Achievements



2007/2008 Performance Targets and 2006/2007 Achievements

Services
2007/2008
Targets
2006/2007 Achievements (%)
Daily Water Supply Services
Fresh water quality
(at connection points)
100% compliance with World Health Organization (WHO) Guidelines for Drinking Water Quality (2004) i Target achieved
Salt water quality
(at connection points)
96% compliance with WSD Water Quality Objectives ii Target achieved
Supply pressure
- fresh water supply
- salt water supply

15 - 30 metres iii
15 metres iii

100%
100%
Response time for attendance to fault complaints
- fresh water supply fault iv
- others


Half a day
A working day


100%
100%
Notice for planned suspension of water supply 3 clear working days' advance notice 100%
Duration of planned suspension of water supply 95 % within 8 hours Target achieved
Time for isolation of burst main upon receipt of report
- for pipe diameter up to 300mm
- for pipe diameter above 300mm to 600mm


90% within 1.5 hours v
90% within 2.5 hours v


Target achieved
Target achieved
Maximum duration of supply interruption due to fresh water main burst 85% within 8 hours
95% within 12 hours
Target achieved
Target achieved
Account-related Services
Taking up of consumership

- in person

- by phone

- by post

- by fax


15 minutes vi
15 minutes vi
7 clear working days vii
7 clear working days vii

99.6%

99.3%

98.8%

98.7%

Issue of final bill upon closure of account 3 clear working days viii 99.5%
Refund of water deposit 9 clear working days 98.5%
Application for autopay 3 clear working days ix 99.9%
Meter-related Services
Reply to application for metered supply to new building projects 20 clear working days 80.6%
Accuracy of water meters Inaccuracy not exceeding +/-3% 92.8%
Application for meter test 8 clear working days x 98.7%
Accuracy of meter readings 99.9% xi Target achieved
Fixing of water meters for new accounts
- small scale new developments xii, or
- existing buildings without plumbing modification
2 clear working days 100%
Reconnection of water supply 24 hours xiii 100%
Issue of meter test report 98% within 3 clear working days xiv Target achieved
Inspection of new building projects 7 clear working days xv 86.5%
Issue of "Certificate Regarding Water Supply Connection (Form WWO 1005)" 10 calendar days xvi New target in 2007/2008
Telephone Enquiry Services
Success rate of measurable incoming calls connected to
Customer Telephone Enquiry Centre
99% 98.7%
Success rate of calls connected to operators 90% 86.7%
Waiting time for operator service 50% not more than 30 seconds xvii 34%
Other Services
Application for fishing licence
- by post
- in person

3 clear working days
10 minutes

100%
95%
Interim reply to correspondence from the public 10 calendar days 98.2%
Reply to application for plumber licence 10 clear working days 100%
i Enhanced target for 2007/2008. The 1993 version of WHO Guidelines was adopted as target in 2006/2007.
ii Enhanced target for 2007/2008. Target in 2006/2007 was 95%.
iii Minimum residual pressure (or pressure range) in the distribution systems except at their extremities.
iv Including cases of no fresh water supply; polluted fresh water supply; and internal fresh water pipe burst likely to cause flooding.
v Enhanced target for 2007/2008. Target in 2006/2007 was 85%.
vi Processing time.
vii Complete process, including finalising account of the outgoing customer.
viii Issue of final bill will be made within 3 clear working days after taking final meter reading.
ix Excluding the one month processing time required by banks.
x From receipt of payment to issue of letters notifying applicants to witness meter tests.
xi This refers to the readings taken by Meter Readers.
xii Referring to those new developments which do not require more than 5 water meters or new connections from government mains and the plumbing works have been checked in order.
xiii After payment has been received.
xiv After the water meter test has been conducted.
xv Upon report of completion of plumbing works by the licensed plumber.
xvi New target in 2007/2008 for issuing the certificate after
(a) receipt of application form WWO 132 Pt II;
(b) the plumbing works have been inspected to the satisfaction of the Water Authority; and
(c) water supply connection has been made.
xvii Enhanced target for 2007/2008.
The achievement rates for the last three financial years ranged from 32.4% to 42.6%.
The 50% quantifier is added as a target for improvement.