Performance Targets and Achievements

2008/2009 Performance Targets and 2007/2008 Achievements

Services
2008/2009
Targets
2007/2008 Achievements (%)
Daily Water Supply Services
Fresh water quality
(at connection points)
100% compliance with World Health Organization (WHO) Guidelines for Drinking Water Quality (2006) i Enhanced target for 2008/2009. Target achieved
Salt water quality
(at connection points)
96% compliance with WSD Water Quality Objectives Target achieved
Supply pressure
- fresh water supply
- salt water supply

15 - 30 metres ii
15 metres ii

100%
100%
Response time for attendance to fault complaints
- fresh water supply fault iii
- others


Half a day
A working day


100%
100%
Notice for planned suspension of water supply 3 clear working days' advance notice 99.7%
Duration of planned suspension of water supply 95% within 8 hours Target achieved
Time for isolation of burst main upon receipt of report
- for pipe diameter up to 300mm
- for pipe diameter above 300mm to 600mm


92% within 1.5 hours iv Enhanced target for 2008/2009.
92% within 2.5 hours iv Enhanced target for 2008/2009.


Target achieved
Target achieved
Maximum duration of supply interruption due to fresh water main burst 85% within 8 hours
95% within 12 hours
Target achieved
Target achieved
Account-related Services
Taking up of consumership

- in person

- by phone

- by post

- by fax


15 minutes v
15 minutes v
7 clear working days vi
7 clear working days vi

100%

99.5%

99.3%

99.2%

Issue of final bill upon closure of account 3 clear working days vii 99.5%
Refund of water deposit 9 clear working days 99.0%
Application for autopay 3 clear working days viii 100%
Meter-related Services
Reply to application for metered supply to new building projects 20 clear working days 84.2%
Accuracy of water meters Inaccuracy not exceeding +/-3% 93.3%
Application for meter test 8 clear working days ix 100%
Accuracy of meter readings 99.95% x Enhanced target for 2008/2009. Target achieved
Fixing of water meters for new accounts
- small scale new developments xi, or
- existing buildings without plumbing modification


2 clear working days


100%
Reconnection of water supply 24 hours xii 100%
Issue of meter test report 98% within 3 clear working days xiii Target achieved
Inspection of new building projects 7 clear working days xiv 93.1%
Issue of "Certificate Regarding Water Supply Connection (Form WWO 1005)" 10 calendar days xv 100%
Telephone Enquiry Services
Success rate of measurable incoming calls connected to
Customer Telephone Enquiry Centre
99% 98.7%
Success rate of calls connected to operators 90% Target achieved
Waiting time for operator service 50% not more than 30 seconds 40.7%
Other Services
Application for fishing licence
- by post
- in person

3 clear working days
10 minutes

100%
95.0%
Interim reply to correspondence from the public 10 calendar days 97.0%
Reply to application for plumber licence 10 clear working days 96.3%
i Enhanced target for 2008/2009. The 2004 version of WHO Guidelines was adopted as target in 2007/2008. Enhanced Target for 2008/2009
ii Minimum residual pressure (or pressure range) in the distribution systems except at their extremities.
iii Including cases of no fresh water supply; polluted fresh water supply; and internal fresh water pipe burst likely to cause flooding.
iv Enhanced target for 2008/2009. Target in 2007/2008 was 90%. Enhanced Target for 2008/2009
v Processing time.
vi Complete process, including finalising account of the outgoing customer.
vii Issue of final bill will be made within 3 clear working days after taking final meter reading.
viii Excluding the one month processing time required by banks.
ix From receipt of payment to issue of letters notifying applicants to witness meter tests.
x Enhanced target for 2008/2009. The target in 2007/2008 for accuracy of readings taken by Meter Readers was 99.90%.Enhanced Target for 2008/2009
xi Referring to those new developments which do not require more than 5 water meters or new connections from government mains and the plumbing works have been checked in order.
xii After payment has been received.
xiii After the water meter test has been conducted.
xiv Upon report of completion of plumbing works by the licensed plumber.
xv After
(a) receipt of application form WWO 132 Pt II;
(b) the plumbing works have been inspected to the satisfaction of the Water Authority; and
(c) water supply connection has been made.