The replacement of about 5 kilometres (km) of aged glass reinforced plastic pipes of the section of Dongjiang water mains P4 with diameters ranging from 2 100 millimetres (mm) to 2 300 mm by mild steel pipes with diameter of 2 200mm.
$1,074.1 million
September 2020
First Quarter of 2023
Construction is in progress
Construction Division
N.A.
Improvement to Dongjiang water mains P4 at Sheung Shui and Fanling (NEC4 ECC Option C)