9355WF

Water Supply to New Housing Developments in Sheung Shui and Fanling

Project Scope

  1. construction of a fresh water service reservoir at Tong Hang with a capacity of 55 000 cubic metres (m3);
  2. laying of about 2 kilometres (km) trunk mains with 900 millimetres (mm) diameter connecting to the new service reservoir to existing water supply system;
  3. laying of about 12 km distribution mains with diameters ranging from 150 mm and 700 mm in the south-western part of Sheung Shui and Fanling (SSF) areas and associated service connections;
  4. upgrading of the existing Tai Po fresh water pumping station and laying of associated water mains; and
  5. associated works including environmental mitigation works, landscaping works and other engineering works.

Approved Project Estimate

$1,699.7 million

Commencement Date

September 2018

Estimated Completion Date

First Quarter of 2024

Current Progress

Construction is in progress

Project Office in WSD

Project Management Division

Consultant

Atkins China Limited