Jump to the beginning of content

9326WF

Integration of Lion Rock High Level Fresh Water Primary Service Reservoir & Tseung Kwan O Primary Fresh Water Service Reservoir

Project Scope

The project scope comprises the integration of Lion Rock high level fresh water primary service reservoirs with the Tseung Kwan O fresh water primary service reservoir by (a) laying of about 1.4 kilometres fresh water mains of sizes ranging from 600 millimetres (mm) diameter to 1 400 mm diameter in Jordan Valley, Sau Mau Ping and Tseung Kwan O new town; and (b) insitu reprovisioning and uprating of the Shum Wan Shan fresh water pumping station from a capacity of 135 000 cubic metres per day (m3/day) to 350 000 m3/day.

Approved Project Estimate

HK$159.7M

Commencement Date

30 June 2008

Completion Date

29 March 2011

Current Progress

100% completed.

Project Office in WSD

Construction Division

Consultant

Not applicable

Contract

Other Related Information

Contractor: Kwan On Construction Co Ltd